Duke Energy continues to plan for a 30-day hydro station outage beginning in mid-January to complete the disconnection of the old powerhouse. They expect to operate Lake James within the normal operating range of 92 to 100 feet during that time. There will be no flow releases from either the old or new powerhouse during this outage; however, the flow valve at the Catawba Dam will be operating to provide flow downstream.